Which of the following does a project manager perform?


A) Defines and develops the project plan
B) Tracks the plan to ensure all key project milestones are completed on time
C) Expert in project planning and management
D) All of these choices

E) A) and C)
F) All of the above

Correct Answer

verifed

verified

What is a group of people who respond to user's questions?


A) Online training
B) Workshop training
C) Help desk
D) Corrective maintenance

E) A) and D)
F) B) and C)

Correct Answer

verifed

verified

What are the three primary variables (or triple constraints) in any project?


A) Time,cost,expense
B) Time,expense,requirements
C) Time,cost,scope
D) Time,cost,quality

E) None of the above
F) A) and D)

Correct Answer

verifed

verified

What illustrates the movement of information between external entities and the processes and data stores within the system?


A) Data flow diagram
B) Computer-aided software engineering (CASE) tools
C) Systems development life cycle
D) Process modeling

E) A) and B)
F) C) and D)

Correct Answer

verifed

verified

Which of the following is not a technique for choosing strategic projects?


A) Categorize projects
B) Perform a financial analysis
C) Focus on organizational goals
D) Develop a project plan

E) A) and B)
F) B) and D)

Correct Answer

verifed

verified

What represents key dates when a certain group of activities must be performed?


A) Project milestones
B) Project objectives
C) Project assumptions
D) Project deliverable

E) C) and D)
F) B) and D)

Correct Answer

verifed

verified

Interoperability is the capability of two or more computer systems to share data and resources,even though they are made by different manufacturers.

A) True
B) False

Correct Answer

verifed

verified

Which of the following is a characteristic of a successful project?


A) Delivered on time
B) Delivered within budget
C) Meets the business's requirements
D) All of these choices

E) All of the above
F) A) and D)

Correct Answer

verifed

verified

A service is a business task.

A) True
B) False

Correct Answer

verifed

verified

What is technical feasibility?


A) Measures the cost-effectiveness of a project
B) Measures how well a solution meets the identified system requirements to solve the problems and take advantage of opportunities
C) Measures the project time frame to ensure that it can be completed on time
D) Measures the practicality of a technical solution and the availability of technical resources and expertise

E) A) and D)
F) None of the above

Correct Answer

verifed

verified

The rational unified process (RUP)methodology,owned by IBM,provides a framework for breaking down the development of software into four gates.

A) True
B) False

Correct Answer

verifed

verified

What is a project plan?


A) Illustrates the movement of information between external entities and the processes and data stores within the system
B) Software suites that automate systems analysis,design,and development
C) A formal,approved document that manages and controls the entire project
D) Involves graphically representing the processes that capture,manipulate,store,and distribute information between a system and its environment

E) A) and D)
F) B) and C)

Correct Answer

verifed

verified

What is process modeling?


A) Illustrates the movement of information between external entities and the processes and data stores within the system
B) Software suites that automate systems analysis,design,and development
C) A formal,approved document that manages and controls the entire project
D) Involves graphically representing the processes that capture,manipulate,store,and distribute information between a system and its environment

E) A) and D)
F) A) and C)

Correct Answer

verifed

verified

Offshore outsourcing occurs when using organizations from developing countries to write code and develop systems.In offshore outsourcing,the country is geographically far away.

A) True
B) False

Correct Answer

verifed

verified

What is a status report?


A) Difficult to quantify or measure
B) Easy to quantify and typically measured to determine the success or failure of a project
C) The measure of the tangible and intangible benefits of an information system
D) A periodic review of actual performance versus expected performance

E) A) and C)
F) A) and B)

Correct Answer

verifed

verified

Which methodology aims for customer satisfaction through early and continuous delivery of useful software components developed by an iterative process with a design point that uses the bare minimum requirements?


A) RAD methodology
B) Agile methodology
C) Waterfall methodology
D) Extreme programming

E) A) and B)
F) None of the above

Correct Answer

verifed

verified

The planning phase establishes a high-level plan of the intended project and determines project goals.

A) True
B) False

Correct Answer

verifed

verified

Which of the following includes a common reason why change occurs?


A) A misunderstanding of the initial scope
B) Shifts in planned technology that force unexpected and significant changes to the business
C) An omission in defining initial scope
D) All of these choices

E) C) and D)
F) B) and D)

Correct Answer

verifed

verified

Which gate in the RUP methodology expands on the agreed-upon details of the system,including the ability to provide an architecture to support and build it?


A) Inception
B) Elaboration
C) Construction
D) Transition

E) None of the above
F) All of the above

Correct Answer

verifed

verified

Which of the following represents the phases in the SDLC?


A) Plan,analysis,design,test,maintain,develop,implement
B) Analysis,plan,design,test,develop,maintain,implement
C) Plan,analysis,design,develop,test,implement,maintain
D) Analysis,plan,develop,design,test,implement,maintain

E) None of the above
F) A) and B)

Correct Answer

verifed

verified