Filters
Question type

Study Flashcards

What is a group of people who respond to users questions?


A) Online training
B) Workshop training
C) Help desk
D) Corrective maintenance

E) C) and D)
F) B) and D)

Correct Answer

verifed

verified

Which gate in the RUP methodology expands on the agreed-upon details of the system,including the ability to provide an architecture to support and build it?


A) Inception
B) Elaboration
C) Construction
D) Transition

E) A) and B)
F) C) and D)

Correct Answer

verifed

verified

What represents key dates when a certain group of activities must be performed?


A) Project milestones
B) Project objectives
C) Project assumptions
D) Project deliverable

E) All of the above
F) B) and C)

Correct Answer

verifed

verified

What are the three primary variables (or triple constraints) in any project?


A) Time,cost,expense
B) Time,expense,requirements
C) Time,cost,scope
D) Time,cost,quality

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Identify the three primary areas a project manager must focus on managing to ensure success.

Correct Answer

verifed

verified

The three primary areas a proj...

View Answer

In a Gantt chart tasks are listed __________ and the project's time frame is listed ____________.


A) Vertically,horizontally
B) Horizontally,vertically
C) Vertically,Vertically
D) Horizontally,horizontally

E) B) and C)
F) B) and D)

Correct Answer

verifed

verified

Exception reports organize and categorize data for managerial perusal.

A) True
B) False

Correct Answer

verifed

verified

Which phase establishes a high-level plan of the intended project and determines project goals?


A) Testing phase
B) Analysis phase
C) Maintenance phase
D) Planning phase

E) None of the above
F) B) and C)

Correct Answer

verifed

verified

What is the outsourcing option that includes the closest location and direct customer control?


A) Onshore outsourcing
B) Nearshore outsourcing
C) Offshore outsourcing
D) None of the above

E) A) and D)
F) A) and C)

Correct Answer

verifed

verified

Corrective maintenance makes system changes to repair design flaws,coding errors,or implementation issues.

A) True
B) False

Correct Answer

verifed

verified

Who are individuals and organizations actively involved in the project or whose interests might be affected as a result of project execution or project completion?


A) Project stakeholders
B) Project managers
C) Project planners
D) Project testers

E) A) and B)
F) B) and C)

Correct Answer

verifed

verified

Which gate in the RUP methodology includes building and developing the project?


A) Inception
B) Elaboration
C) Construction
D) Transition

E) All of the above
F) A) and B)

Correct Answer

verifed

verified

_____________ implementation installs the new system in phases (for example by department)until it is verified that it works correctly.

Correct Answer

verifed

verified

Which implementation installs the new system in phases (for example by department) until it is verified that it works correctly?


A) Parallel implementation
B) Plunge implementation
C) Pilot implementation
D) Phased implementation

E) None of the above
F) A) and B)

Correct Answer

verifed

verified

Project ______________ are quantifiable criteria that must be met for the project to be considered a success.

Correct Answer

verifed

verified

An organization must identify what it wants to do and how it is going to do it.What does the "what" part of this question focus on?


A) Justification of the project
B) Definition of the project
C) Expected results of the project
D) All of the above

E) All of the above
F) B) and D)

Correct Answer

verifed

verified

What are project constraints?


A) Specific factors that can limit options
B) Factors that are considered to be true,real,or certain without proof or demonstration
C) Quantifiable criteria that must be met for the project to be considered a success
D) A document issued by the project initiator or sponsor that formally authorizes the existence of a project and provides the project manager with the authority to apply organizational resources to project activities

E) B) and D)
F) A) and B)

Correct Answer

verifed

verified

The implementation phase involves taking all of the detailed design documents from the design phase and transforming them into the actual system.

A) True
B) False

Correct Answer

verifed

verified

What are the specific business requests the system must meet to be successful,so the analysis phase is critical because business requirements drive the entire systems development effort?


A) COBIT
B) Conversion
C) Business requirements
D) Sign-off

E) All of the above
F) B) and C)

Correct Answer

verifed

verified

Object-oriented languages provide a programming method that provides for interactive modules to a website.

A) True
B) False

Correct Answer

verifed

verified

Showing 101 - 120 of 293

Related Exams

Show Answer