What is the success rate for a project using the waterfall methodology?


A) 1 in 10
B) 2 in 10
C) 4 in 10
D) 8 in 10

E) A) and C)
F) C) and D)

Correct Answer

verifed

verified

Which of the following details the steps the system must perform along with the expected result of each step?


A) testing phase
B) testing documentation
C) test conditions
D) All of these are correct.

E) A) and D)
F) A) and B)

Correct Answer

verifed

verified

What is the project scope?


A) an individual who is an expert in project planning and management, defines and develops the project plan, and tracks the plan to ensure that the project is completed on time and on budget
B) a description of the business need (the problem the project will solve) and the justification, requirements, and current boundaries for the project
C) a formal, approved document that manages and controls the entire project
D) a graphical representation of the processes that capture, manipulate, store, and distribute information between a system and its environment

E) C) and D)
F) A) and C)

Correct Answer

verifed

verified

What is an internal department that oversees all organizational projects?


A) project deliverables
B) project scope
C) project management office
D) project milestones

E) A) and D)
F) All of the above

Correct Answer

verifed

verified

Gate four is transition, and the primary questions answered in this phase address ownership of the system and training of key personnel.

A) True
B) False

Correct Answer

verifed

verified

Which of the following is a business-related consequence of successful software?


A) increased revenues
B) damage to brand reputation
C) increased liabilities
D) increased expenses

E) A) and D)
F) A) and C)

Correct Answer

verifed

verified

What is the number one reason that IT projects fall behind schedule or fail?


A) change in business goals during the project
B) lack of support from business management
C) unclear or missing business requirements
D) change in technology during the project

E) All of the above
F) B) and C)

Correct Answer

verifed

verified

What is feasibility?


A) difficult to quantify or measure
B) easy to quantify and typically measured to determine the success or failure of a project
C) the measure of the tangible and intangible benefits of an information system
D) periodic reviews of actual performance versus expected performance

E) A) and C)
F) None of the above

Correct Answer

verifed

verified

Project assumptions are specific factors that can limit options including budget, delivery dates, available skilled resources, and organizational policies.

A) True
B) False

Correct Answer

verifed

verified

A data flow diagram (DFD) illustrates the movement of information between external entities and the processes and data stores within the system.

A) True
B) False

Correct Answer

verifed

verified

The Project Management Office (PMO) is an internal department that oversees all organizational projects.

A) True
B) False

Correct Answer

verifed

verified

Which of the following is a fundamental of the RAD methodology?


A) focus initially on creating a prototype that looks and acts like the desired system
B) actively involve system users in the analysis, design, and development phases
C) accelerate collecting the business requirements through an interactive and iterative construction approach
D) All of these are correct.

E) B) and D)
F) A) and B)

Correct Answer

verifed

verified

Preventative maintenance makes system changes to reduce the chance of future system failure.

A) True
B) False

Correct Answer

verifed

verified

What represents key dates when a certain group of activities must be performed?


A) project milestones
B) project objectives
C) project assumptions
D) project deliverable

E) All of the above
F) B) and D)

Correct Answer

verifed

verified

Service-oriented architecture (SOA) is a business-driven enterprise architecture that supports integrating a business as linked, repeatable activities, tasks, or services.

A) True
B) False

Correct Answer

verifed

verified

What is a business-driven enterprise architecture that supports integrating a business as linked, repeatable activities, tasks, or services?


A) service-oriented architecture
B) service
C) loose coupling
D) interoperability

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Summary internal reports highlight situations occurring outside of the normal operating range for a condition or standard.

A) True
B) False

Correct Answer

verifed

verified

A methodology is a set of policies, procedures, standards, processes, practices, tools, techniques, and tasks that people apply to technical and management challenges.

A) True
B) False

Correct Answer

verifed

verified

Control objects for information and related technology (COBIT) are software suites that automate systems analysis, design, and development.

A) True
B) False

Correct Answer

verifed

verified

What is a business task?


A) service-oriented architecture
B) service
C) loose coupling
D) interoperability

E) A) and B)
F) A) and D)

Correct Answer

verifed

verified