Filters
Question type

Study Flashcards

Status report periodic reviews of actual performance versus expected performance.

A) True
B) False

Correct Answer

verifed

verified

Which machine language is difficult for people to understand?


A) First generation machine language
B) Fifth generation machine language
C) Third generation machine language
D) Fourth generation machine language

E) A) and D)
F) C) and D)

Correct Answer

verifed

verified

Which programming language looks similar to human languages?


A) First generation machine language
B) Second generation machine language
C) Third generation machine language
D) Fourth generation machine language

E) A) and B)
F) B) and C)

Correct Answer

verifed

verified

What is the outsourcing option that includes the most remote location and indirect customer control?


A) Onshore outsourcing
B) Nearshore outsourcing
C) Offshore outsourcing
D) None of the above

E) None of the above
F) B) and C)

Correct Answer

verifed

verified

Loose coupling is the capability of two or more computer systems to share data and resources, even though they are made by different manufacturers.

A) True
B) False

Correct Answer

verifed

verified

What are project objectives?


A) Quantifiable criteria that must be met for the project to be considered a success
B) Products, services, or processes that are not specifically a part of the project
C) Any measurable, tangible, verifiable outcome, result or item that is produced to complete a project or part of a project
D) Defines the work that must be completed to deliver a product with the specified features and functions

E) B) and C)
F) A) and D)

Correct Answer

verifed

verified

What is also provided for the system users and can be online or in a classroom?


A) Training
B) Testing
C) Implementation phase
D) Testing phase

E) A) and D)
F) All of the above

Correct Answer

verifed

verified

What runs over the Internet or on a CD or DVD, and employees complete the training on their own time at their own pace?


A) Online training
B) Workshop training
C) Help desk
D) Corrective maintenance

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

A kill switch is a logical relationship that exists between the project tasks, or between a project task and a milestone.

A) True
B) False

Correct Answer

verifed

verified

A project objective is any measurable, tangible, verifiable outcome, result, or item that is produced to complete a project or part of a project.

A) True
B) False

Correct Answer

verifed

verified

What is a person or event that is the catalyst for implementing major changes for a system to meet business changes?


A) Change controller
B) Change over
C) Change management
D) Change agent

E) B) and C)
F) A) and D)

Correct Answer

verifed

verified

A Pert chart is a simple bar chart that lists project tasks vertically against the project's time frame, listed horizontally.

A) True
B) False

Correct Answer

verifed

verified

Which document prioritizes all of the business requirements by order of importance to the company?


A) Requirements documentation
B) Requirements management
C) Requirements definition document
D) All of the above

E) All of the above
F) C) and D)

Correct Answer

verifed

verified

What measures how well a solution meets the identified system requirements to solve the problems and take advantage of opportunities?


A) Economic feasibility
B) Operational feasibility
C) Schedule feasibility
D) Technical feasibility

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Which programming language is for artificial intelligence and neural network?


A) Fifth generation machine language
B) Second generation machine language
C) Third generation machine language
D) Fourth generation machine language

E) B) and C)
F) All of the above

Correct Answer

verifed

verified

What tests individual units or pieces of code for a system?


A) Unit testing
B) Development testing
C) Integration testing
D) User acceptance testing

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

Project objectives are quantifiable criteria that must be met for the project to be considered a success.

A) True
B) False

Correct Answer

verifed

verified

What is a business requirement?


A) The nonspecific business requests the system must meet to be successful
B) The specific business requests the system must meet to be successful
C) The nonspecific methodology the system must meet to be successful
D) The specific methodology the system must meet to be successful

E) B) and C)
F) None of the above

Correct Answer

verifed

verified

What is a project manager?


A) An individual who is an expert in project planning and management, defines and develops the project plan, and tracks the plan to ensure that the project is completed on time and on budget.
B) Describes the business need (the problem the project will solve) and the justification, requirements, and current boundaries for the project.
C) A formal, approved document that manages and controls the entire project.
D) Involves graphically representing the processes that capture, manipulate, store, and distribute information between a system and its environment.

E) A) and B)
F) All of the above

Correct Answer

verifed

verified

Rapid application development (RAD) methodology (also called rapid prototyping) emphasizes extensive user involvement in the rapid and evolutionary construction of working prototypes of a system, to accelerate the systems development process.

A) True
B) False

Correct Answer

verifed

verified

Showing 181 - 200 of 321

Related Exams

Show Answer